Go Back   IceInSpace > Equipment > DIY Observatories
Register FAQ Calendar Today's Posts Search

Reply
 
Thread Tools Rate Thread
  #41  
Old 01-09-2013, 05:40 PM
Paul Haese's Avatar
Paul Haese
Registered User

Paul Haese is offline
 
Join Date: Jan 2009
Location: Adelaide
Posts: 9,991
Quote:
Originally Posted by strongmanmike View Post
Footing set in solid rock huh?...cool, that shouldn't move then

Mike
Yeah I am contemplating putting some REO into the rock by drilling in and chemical anchoring. Its all good though. Some more planning first though.
Reply With Quote
  #42  
Old 18-09-2013, 05:01 PM
Quark's Avatar
Quark (Trevor)
Registered User

Quark is offline
 
Join Date: Apr 2008
Location: Broken Hill NSW Australia
Posts: 4,110
First time in a long time I have looked in this section of IIS.
Seems like you have certainly been busy Paul, looks great.

Often I have been able to image in conditions that would have made it impossible, if not for the protection of my dome.

Clear Sky's
Trev
Reply With Quote
  #43  
Old 18-09-2013, 05:14 PM
Paul Haese's Avatar
Paul Haese
Registered User

Paul Haese is offline
 
Join Date: Jan 2009
Location: Adelaide
Posts: 9,991
Quote:
Originally Posted by Quark View Post
First time in a long time I have looked in this section of IIS.
Seems like you have certainly been busy Paul, looks great.

Often I have been able to image in conditions that would have made it impossible, if not for the protection of my dome.

Clear Sky's
Trev

Thanks Trev, things have stalled a little as I am planning how power etc will make its way into the observatory.
Reply With Quote
  #44  
Old 18-09-2013, 08:29 PM
Peter.M's Avatar
Peter.M
Registered User

Peter.M is offline
 
Join Date: Sep 2011
Location: Adelaide
Posts: 970
Quote:
Originally Posted by Paul Haese View Post
Thanks Trev, things have stalled a little as I am planning how power etc will make its way into the observatory.
Little hamster in a wheel?
Reply With Quote
  #45  
Old 19-09-2013, 02:15 PM
ZeroID's Avatar
ZeroID (Brent)
Lost in Space ....

ZeroID is offline
 
Join Date: May 2010
Location: Auckland, NZ
Posts: 4,949
Quote:
Originally Posted by Paul Haese View Post
Yeah I am contemplating putting some REO into the rock by drilling in and chemical anchoring. Its all good though. Some more planning first though.

Use Rockite, that is what it is designed for. Bunnings have it. I used it for rocket nozzles, it is basically nonexpanding but sets like rock and secures them extremely well. Cures in about 30 mins for hard but goes absolutely solid in 24 hrs.
It is used in the building industry to secure railings and the like into concrete floors and surfaces.
Reply With Quote
  #46  
Old 02-10-2013, 07:06 PM
Paul Haese's Avatar
Paul Haese
Registered User

Paul Haese is offline
 
Join Date: Jan 2009
Location: Adelaide
Posts: 9,991
Update guys.

Went down to the house today and formed up the pier support. Steel reo rod of 10mm with some mesh over the top. Also you can see the power conduit with guide rope.

Concrete this weekend. Another week or two and I will go the outer concrete for the rest of the obs to sit on.
Attached Thumbnails
Click for full-size image (IMG_0651.jpg)
205.2 KB78 views
Reply With Quote
  #47  
Old 05-10-2013, 02:29 PM
Paul Haese's Avatar
Paul Haese
Registered User

Paul Haese is offline
 
Join Date: Jan 2009
Location: Adelaide
Posts: 9,991
Had a visit from my old mate Conacrete today. Pier support poured and finished. Dimensions are 1400 x 1200 x 900 (tapering from the top down the bottom with a dimension of 600 x 600); approximately around 0.85 cubic meters. I think that is about 2.1 tonnes. Certainly more than enough weight to hold the scope in position.

Maybe end of next week I will pour the outside section of concrete to hold the dome. Images to follow.

For now this is the pier support image.
Attached Thumbnails
Click for full-size image (IMG_0654.jpg)
205.5 KB46 views
Reply With Quote
  #48  
Old 12-10-2013, 07:46 PM
Paul Haese's Avatar
Paul Haese
Registered User

Paul Haese is offline
 
Join Date: Jan 2009
Location: Adelaide
Posts: 9,991
Now that the pier support has been stripped of its formwork, I picked up a half a tonne of compaction sand to level off the site to allow for concrete to be poured next weekend, which will surround the pier support. Watered in and levelled off. The site will need to be quite compacted before I pour concrete to ensure it remains stable. This stuff sets very hard after a bit of rain, which we are expecting tomorrow.
Attached Thumbnails
Click for full-size image (IMG_0668.jpg)
181.7 KB58 views
Reply With Quote
  #49  
Old 15-10-2013, 07:48 PM
Paul Haese's Avatar
Paul Haese
Registered User

Paul Haese is offline
 
Join Date: Jan 2009
Location: Adelaide
Posts: 9,991
Update,

Today I went down to the house and formed up the outer concrete ring. Concrete is ordered for Saturday and the weather looks good. For those interested I used 6mm plywood for the form and 75mm gal mess for the reinforcement. I cut the plywood to 100mm thick and the reo stools are 45mm high. Concrete will be 25mpa with structural aggregate. Getting exciting now. Not long before the dome will be installed.

In the first image you can see the pins placed to hold the form and I have adhered the expansion joint foam to the side of the pier support.

In the second image you can see the completed form. I had to scribe around the rocks on the other side and black form plastic to prevent moisture coming up through the concrete.

Don't mind the rocks, we have been having some windy days of late (normal for the time of year) and those are just there to hold down the mesh until pour day.
Attached Thumbnails
Click for full-size image (IMG_0672.jpg)
201.0 KB61 views
Click for full-size image (IMG_0677.jpg)
199.7 KB79 views
Reply With Quote
  #50  
Old 15-10-2013, 07:57 PM
RickS's Avatar
RickS (Rick)
PI cult recruiter

RickS is offline
 
Join Date: Apr 2010
Location: Brisbane
Posts: 10,584
Looks good, Paul! Will you christen the slab with champagne?
Reply With Quote
  #51  
Old 15-10-2013, 08:19 PM
Paul Haese's Avatar
Paul Haese
Registered User

Paul Haese is offline
 
Join Date: Jan 2009
Location: Adelaide
Posts: 9,991
Quote:
Originally Posted by RickS View Post
Looks good, Paul! Will you christen the slab with champagne?
Look if I don't my wife will.
Reply With Quote
  #52  
Old 15-10-2013, 09:38 PM
strongmanmike's Avatar
strongmanmike (Michael)
Highest Observatory in Oz

strongmanmike is offline
 
Join Date: May 2006
Location: Canberra
Posts: 17,691
Hey that looks veeery familiar Paul

Your observatory will be operational before you know it

Incidentally the pier support pad looks quite large, was there a particular reason for this?

Mike
Reply With Quote
  #53  
Old 15-10-2013, 10:00 PM
Paul Haese's Avatar
Paul Haese
Registered User

Paul Haese is offline
 
Join Date: Jan 2009
Location: Adelaide
Posts: 9,991
Quote:
Originally Posted by strongmanmike View Post
Hey that looks veeery familiar Paul

Your observatory will be operational before you know it

Incidentally the pier support pad looks quite large, was there a particular reason for this?

Mike

Yes thought you might see some familiarity there Mike. The diameter is 3 meters though.

The whole process started in March this year when I decide to buy the dome. Building the backend of the scope has taken about 7 weeks now and is about to have a major upgrade from what I lovingly called the Battle Tank. I will you guessing on that.

The pier support is the same as the one in the roll off roof obs seen in the background. The larger the pier support the less likely there will be any movement from the weight of any large mass such as a large OTA swinging and causing a moment of inertia. All this obs has been planned with a much larger telescope in mind down the track. I don't want to leave anything to chance. The imaging train and the pier support structure are part of that plan. The pier will also have a large diameter too to prevent deflection. Part of my plan to collect mega data. For now it will be the RC12, but in time it will be something else. I will give you a guess though. The pier will be around 600mm long at most.
Reply With Quote
  #54  
Old 15-10-2013, 10:11 PM
Astroman's Avatar
Astroman (Andrew Wall)
<><><><>

Astroman is offline
 
Join Date: Feb 2005
Location: Paralowie, South Australia
Posts: 4,367
Nice Paul a CDK20 would look good on that Pad Good luck with the concrete.
Reply With Quote
  #55  
Old 15-10-2013, 10:42 PM
Paul Haese's Avatar
Paul Haese
Registered User

Paul Haese is offline
 
Join Date: Jan 2009
Location: Adelaide
Posts: 9,991
Hmmm not sure about a 20. That might be a bit too big.
Reply With Quote
  #56  
Old 19-10-2013, 03:41 PM
Astroman's Avatar
Astroman (Andrew Wall)
<><><><>

Astroman is offline
 
Join Date: Feb 2005
Location: Paralowie, South Australia
Posts: 4,367
Hope your concrete turned out well Paul. Just sprayed mine to add a little moisture to it. A little hot out there today.... Great day for curing concrete.
Reply With Quote
  #57  
Old 19-10-2013, 05:02 PM
Paul Haese's Avatar
Paul Haese
Registered User

Paul Haese is offline
 
Join Date: Jan 2009
Location: Adelaide
Posts: 9,991
It was ok Andrew, but I ordered 25MPA and I think I got 35MPA. The mix went off in 45 minutes. I just got it screeded off and it was getting hard. That made it hard to trowel it off. I ended up with small holes of around 5mm in the topping here and there. I can sort it later with flowcrete, but the mix came from Port Elliot and it was a little dry on arrival. It will be hard as a rock now. It should have had a bit more water in it to account for the warmer weather.

Anyway another image for you guys to peruse. Next step installing the dome next weekend, with the help from a mate or two.
Attached Thumbnails
Click for full-size image (IMG_0682.jpg)
175.7 KB64 views
Reply With Quote
  #58  
Old 19-10-2013, 05:59 PM
Astroman's Avatar
Astroman (Andrew Wall)
<><><><>

Astroman is offline
 
Join Date: Feb 2005
Location: Paralowie, South Australia
Posts: 4,367
Good Job Paul. Bad luck about the quick setting though. I was lucky mine was quite wet, but also only had 2km from the Concrete place to here, so not that much of a drive. Cant wait to see the dome on it.
Reply With Quote
  #59  
Old 19-10-2013, 09:22 PM
Paul Haese's Avatar
Paul Haese
Registered User

Paul Haese is offline
 
Join Date: Jan 2009
Location: Adelaide
Posts: 9,991
Its all good Andrew I will most likely put in some form of vinyl so the umbilical cord does not catch anywhere. So it will be hidden from view.
Reply With Quote
  #60  
Old 21-10-2013, 07:10 PM
Paul Haese's Avatar
Paul Haese
Registered User

Paul Haese is offline
 
Join Date: Jan 2009
Location: Adelaide
Posts: 9,991
Stripped the form out today and cleaned up the site a bit. Now for the dome to be installed. With any luck weather this weekend will be good.
Attached Thumbnails
Click for full-size image (IMG_0683.jpg)
173.2 KB58 views
Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +10. The time is now 04:50 PM.

Powered by vBulletin Version 3.8.7 | Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Advertisement
Astrophotography Prize
Advertisement
Bintel
Advertisement