Old 26-07-2010, 06:32 PM
Jeffkop's Avatar
Jeffkop (Jeff)
Star-Fishing

Jeffkop is offline
 
Join Date: Jan 2008
Location: Tuckurimba
Posts: 885
Quote:
Originally Posted by sheeny View Post
Are you building a false floor over the footing or will the top of the footing be at floor level?

If its at floor level, have a think about the size in plan of that footing, I suggest Jeff. The edge of your footing will be about 600 to 700mm from the pier, so if you are in the obs moving around you will be changing the load on the footing... it probably won't make a difference if your footing is solidly keyed to bedrock, but I'd hate to go to the trouble of building an obs only to find the scope moves when you walk around it.

In my obs, the footing is level with the floor, so I kept my footing size down to 350 x 350 x 1000 deep (but in reality I hit bedrock at 700mm so I keyed it in 50mm and I was more than happy!

Al.
Al .. The floor will be about 400mm - 500mm above the ground and so to the top of the footing. I planned to bolt the pier onto threaded rods that were into the footing. Do you think I should be putting the pier into the footing ???

The floor of the Obs will not be in contact with the pier
Reply With Quote
  #22  
Old 26-07-2010, 06:35 PM
Jeffkop's Avatar
Jeffkop (Jeff)
Star-Fishing

Jeffkop is offline
 
Join Date: Jan 2008
Location: Tuckurimba
Posts: 885
Quote:
Originally Posted by bert View Post
Nah, just bolt it to the concrete. And I prefer to use nylon anchors and coach bolts in the concrete vs dynabolts. If you get the anchors wrong you can pull them out and it doesnt leave anything sticking out of the concrete. Embedding it in the concrete gains nothing.




1.5 X 1.5 x 1.5 is a square (I should have used a cube, my bad) that I recommended you DO NOT do. If you want to use that much concrete go a meter by a meter, by 2 deep. Then you can walk close to the scope without walking on the isolated pier, and far stronger. I'm sure sheeny can explain the math, cause I sure as hell cant....

My concrete pad is only around 1/4m3 (compared to your plan of using 3.3m3)of concrete. It is a 300mm round hole down 1200mm slightly flared at the top and bottom. The secret is go deep. Sheeny was lucky that he hit bedrock, he effectively used the rock as an extension of his footing.
Sorry Brett. I didnt explain fully what Im up to. See the reply to AL above this post.
Reply With Quote
  #23  
Old 26-07-2010, 07:39 PM
Ian Robinson
Registered User

Ian Robinson is offline
 
Join Date: Jan 2007
Location: Gateshead
Posts: 2,205
Interesting that you guys advocate supermassive footings for piers (ie 1.5m x 1.5m x 1.5m presumeably only maybe 300mm above ground level).
Is there a good engineering reason for this ? and does this depend on the type of gound you have ?

I have seen similar recommendation by guys at CN, BUT there they have the issue of the ground freezing in winter - and it's done because of this annual freezing and thawing. Obviously not a problem here unless you live above the snow line (in the Snowy Mountains). So is it really necessary to have such massive (AND DEEP) footings ?
Reply With Quote
  #24  
Old 26-07-2010, 09:09 PM
sheeny's Avatar
sheeny (Al)
Spam Hunter

sheeny is offline
 
Join Date: Jun 2005
Location: Oberon NSW
Posts: 14,438
Quote:
Originally Posted by Jeffkop View Post
Al .. The floor will be about 400mm - 500mm above the ground and so to the top of the footing.
That's not a problem with your floor over the footing (and separated from it).

Quote:
Originally Posted by Jeffkop View Post
I planned to bolt the pier onto threaded rods that were into the footing. Do you think I should be putting the pier into the footing ???

The floor of the Obs will not be in contact with the pier
For rigidity the preferred options in decreasing order of rigidity of the pier footing connection are:
  • Embed the pier in the footing
  • Adequately grout the pier to the footing
  • Bolt it securely to a smooth, flat footing (with a thick, stubby base plate (distance of bolt from pier member / thickness of baseplate <=2!)
  • Bolt it to an uneven footing
  • Bolt it on levelling nuts on the hold down bolts (but no grout)
  • Bolt it down on a central packer only (no grout)
A well grouted connection is near as makes no difference as good as embedding the pier, and it's easier to do a neat job and get it plumb.

The "right way" to apply the grout is set you pier up level and plumb on the anchor bolts with levelling nuts underneath, then use a good quality non-shrink grout to fill underneath. If your grout is stiff push it in from one side until it comes out the opposite side so you know the joint is full. If you are using a free flowing grout (epoxy etc) then form up for the grout and pour it in from the one side to make sure there are no bubbles in the joint.

Now if you are a bit lazy like me and think you can do it...... (WARNING! There's potential for this to go wrong so attempt this at your own risk!)
What I did with mine was cast my footing about 20mm lower than floor level. I then made a stiff mortar mix and levelled and smoothed that off to floor level. While it was wet I placed the pier on it and used the anchor nuts to pull the pier down just slightly into the mortar (just enough to make sure there's no air bubbles - not enough to deform the mortar around the baseplate) and adjust the nuts till the pier is plumb and level. Then leave it to cure and make sure is protected from anything that could bump or move it while the mortar sets. After a week of curing tension the anchor nuts up tight. I used a tension wrench to set mine just because I could. Avoid tightening the anchor nuts too soon so you don't crush the fresh mortar/grout.

... and Robert is your mother's brother...

Quote:
Originally Posted by Ian Robinson View Post
Interesting that you guys advocate supermassive footings for piers (ie 1.5m x 1.5m x 1.5m presumeably only maybe 300mm above ground level).
Is there a good engineering reason for this ? and does this depend on the type of gound you have ?

I have seen similar recommendation by guys at CN, BUT there they have the issue of the ground freezing in winter - and it's done because of this annual freezing and thawing. Obviously not a problem here unless you live above the snow line (in the Snowy Mountains). So is it really necessary to have such massive (AND DEEP) footings ?
I could see the need for a wide footing in sandy soil perhaps where there's simply no chance of getting anything too solid, but in reality depth is what you need. The ground pressure increases linearly with depth, so the deeper you go the more secure it is... unless you find rock.

Active clays soils will always be a problem with movement unless you can get to bedrock. In that case, you might have to live (hopefully) with regular polar alignments to correct the movements).

Al.

Last edited by sheeny; 26-07-2010 at 09:15 PM. Reason: typos
Reply With Quote
  #25  
Old 26-07-2010, 10:43 PM
Ian Robinson
Registered User

Ian Robinson is offline
 
Join Date: Jan 2007
Location: Gateshead
Posts: 2,205
Quote:
Originally Posted by sheeny View Post
That's not a problem with your floor over the footing (and separated from it).



For rigidity the preferred options in decreasing order of rigidity of the pier footing connection are:
  • Embed the pier in the footing
  • Adequately grout the pier to the footing
  • Bolt it securely to a smooth, flat footing (with a thick, stubby base plate (distance of bolt from pier member / thickness of baseplate <=2!)
  • Bolt it to an uneven footing
  • Bolt it on levelling nuts on the hold down bolts (but no grout)
  • Bolt it down on a central packer only (no grout)
A well grouted connection is near as makes no difference as good as embedding the pier, and it's easier to do a neat job and get it plumb.

The "right way" to apply the grout is set you pier up level and plumb on the anchor bolts with levelling nuts underneath, then use a good quality non-shrink grout to fill underneath. If your grout is stiff push it in from one side until it comes out the opposite side so you know the joint is full. If you are using a free flowing grout (epoxy etc) then form up for the grout and pour it in from the one side to make sure there are no bubbles in the joint.

Now if you are a bit lazy like me and think you can do it...... (WARNING! There's potential for this to go wrong so attempt this at your own risk!)
What I did with mine was cast my footing about 20mm lower than floor level. I then made a stiff mortar mix and levelled and smoothed that off to floor level. While it was wet I placed the pier on it and used the anchor nuts to pull the pier down just slightly into the mortar (just enough to make sure there's no air bubbles - not enough to deform the mortar around the baseplate) and adjust the nuts till the pier is plumb and level. Then leave it to cure and make sure is protected from anything that could bump or move it while the mortar sets. After a week of curing tension the anchor nuts up tight. I used a tension wrench to set mine just because I could. Avoid tightening the anchor nuts too soon so you don't crush the fresh mortar/grout.

... and Robert is your mother's brother...



I could see the need for a wide footing in sandy soil perhaps where there's simply no chance of getting anything too solid, but in reality depth is what you need. The ground pressure increases linearly with depth, so the deeper you go the more secure it is... unless you find rock.

Active clays soils will always be a problem with movement unless you can get to bedrock. In that case, you might have to live (hopefully) with regular polar alignments to correct the movements).

Al.
I see.

So a lazybones like me might get away with a footing that is not as deep and if my pier "moves" over time, I can compensate for it by relevelling the adapter plate the GEM will be sitting ontop.
Reply With Quote
  #26  
Old 27-07-2010, 07:02 AM
sheeny's Avatar
sheeny (Al)
Spam Hunter

sheeny is offline
 
Join Date: Jun 2005
Location: Oberon NSW
Posts: 14,438
Quote:
Originally Posted by Ian Robinson View Post
I see.

So a lazybones like me might get away with a footing that is not as deep and if my pier "moves" over time, I can compensate for it by relevelling the adapter plate the GEM will be sitting ontop.
You might... and you might not. If you don't do your best to make it stable, then you have no one else to blame when you have to do a polar alignment and maybe drift align every time you want to use your scope...

Al.
Reply With Quote
  #27  
Old 27-07-2010, 09:42 AM
Jeffkop's Avatar
Jeffkop (Jeff)
Star-Fishing

Jeffkop is offline
 
Join Date: Jan 2008
Location: Tuckurimba
Posts: 885
Thanks for this advise Al & Brett .. I wasnt aware of the grouting issues. Looks like Im going to have to box up a section on top of the footing ... less pipe to get then.

My soil here is sandy .. VERY sandy. We live over the top of a huge ridge of sandstone. The underground water tastes absolutely perfect here.

So from your advise you suggest as deep a footing and as wide a footing as is practical. Im thinking 1.5mx1.5mx2m now. Depends on how big I have to get the XY dimensions to allow a backhoe to get down 2m I think. I dont know how far down until I meet stone, but I do know that the sandstone itself is relatively soft here. I guess once we hit a huge stone object I will have to evaluate the depth we are and then make adjustments to the other dimensions to suit. Of course I am limited in that dimension by the size of the room and the position of the post holes too.
In any case looks like a job for a backhoe for an hour or so.

This is a very interesting thread for me, thanks for your inputs.
Reply With Quote
  #28  
Old 27-07-2010, 01:13 PM
gregbradley's Avatar
gregbradley
Registered User

gregbradley is offline
 
Join Date: Feb 2006
Location: Sydney
Posts: 18,185
Hi Geoff,

I have just built an observatory and this is the third one I have done and here is a quick rundown of some principles I used that have also been successful on previous observatories plus a few things I did differently based on what I learnt was a problem with other observatories I built:

0. Size - 5 x 3 metres and walls are 2.2mm high, roof overhangs to form a protective eave about 300mm each side, computer room is a kliplok flat roof with insulation under it. Location was carefully scouted and is in a spot (I am on 4 acres) which is close to the house, is private, has no stray light hitting it, is hidden from view, has a clear unobstructed view of the imageable sky, is protected from wind and storm directions and is in a very calm area of the property. Also next to gardens for a pleasant outlook.

1. made 2 pads. One is a pier about 800 x800 x800-900mm deep with a 100mm flange on top about 200mm wide to give about 1m square on top that goes down 800 x 800-900mm. It is lined with building plastic and full of reo steel. It is flat and level on top and about 30mm higher than the paver floor around it and separate from that floor.

If you have a backhoe that is good but digging clay by hand means 900m is REALLY deep! It is probably something like a ton of concrete and steel there - it could be calculated and I'd be interested to know but it is something like that.

The 2nd pad is for a portable pier and is simply 2m x 2m by about 150mm thick with reo.

2. Floor is road base, paver base about 100mm then 40mm thick concrete pavers with pavlock sand in joints. The pavers end a few mm from the slabs.

3. Frame is treated pine 90 x 90 posts dug into the ground about 600mm and set with rapid set concrete bags. Just put the post in, pour in a bag of rapid set and then hose it to make it set.

4. Rest of the frame is 75 x 45 mostly fixed to the posts with 3mm thick 60 x 60mm L brackets from Bunnings and 50mm roofing screws.
The advantage of that is if something needs to be shifted later to make it more square then you can undo the screws and move it and rescrew it very easily. Once nailed it is now hard to change anything. I did have to reshift a few times so it was very very handy to use this and it is quick and easy to use. The brackets though are about $3.50 each.

5. Wall has a layer of Aircell Insulbreak (foam cored aircell bubble wrap type insulation). This is clean (no fibreglass) and effective and quite strong. Roof has it too. I don't want my gear to bake in 40C days.

I sprayed the inside of this and everything else flat black paint.

6. Roof is pitched up and over with gables at each end. Make up pine trusses out of 75 x 35mm treated pine (triangles). Fix them together with a ridge tree beam - 75 x 45mm treated pine.

7. This is all attached to a 100 x 50 x 3mm wall steel section. I drilled holes in the section and got some bolts that act as axles and 4 wheels per side. Wheels are 90mm diameter narrow wheels from Bunnings. Richmond Wheels and Castors though have an incredible range - Bunnings is limited and I went through several types of wheels.

I think garage roller door wheels would be better and their C section track wold be my choice next time. They have strong axles and have a screw on mounting plate which is strong and easy to fix. My wheels lean a bit because the bolt axle is too narrow (its hard to find a bolt that is the right diameter for the wheel and has no thread where the wheel rotates but can be bolted on. Hence the garage automatic door type wheel, axles, mounting plate and track would make it very simple and smooth. Also might make an auto garage door opener an option somehow for the roof (not sure - Brett would know how).

8. Walls and roof were .42mm thick colorbond Trimdek and screwed on.
I have barge cappings to the gables and one is set higher and is not fixed to the roof only the gable as a receiving flashing for the roof to roll under when closed.

9. I intend to install a louvre down low on the walls and install solar powered fans to get an airflow going.

10. My one has a small computer room with a sliding insect screen for summer bug control.

11. I have a steel pier made by Pegasus Piers in Qld and bought though Sirius Observatories. It is super well made and about 800mm tall. It bolts onto the pier with 6 anchor bolts and has slots not holes so I can rotate it a bit if needed to be in the polar alignment range of the mount.
The concrete pier is level and the metal pier has a levelling plate on top for fine levelling adjustment so I plan to simply bolt the metal pier (10inches in diameter and 8mm steel wall thickness and weighs 96kgs) to the concrete pier

12. I may put a whirlybird on the roof to assist in keeping temps down in summer.

That's about it.

A couple of design considerations from previous observatories.

I kept the pier height lower this time. My dark site pier is an 8 inch steel tube stuck in a hole I dug 800mm deep and set in rapid set concrete. It is about 1.2 metres above floor height. After the mount was installed it meant a 12.5 inch RCOS tube stuck out into the windstream about 300mm. That meant unless it was calm you couldn't image with it.

So wall height is 2.2m or so and pier is 800mm high.

I also set my roof trusses so with my new scope mounted it would not hit anything physically no matter roof closed or open. A lot of observatories the scope needs to be parked horizontally before you can close the roof and clearance above the guidescope can be minimal. Considering the cost of gear that opens the door to the possibility of the scope hitting the roof and getting damaged. I think that is important as I have had some mishaps despite being careful in the past.

You want to use materials that don't hold heat. You don't want lots of different temp air masses in your observatory - you want things still and thermally the same as much as possible.

You want the pier isolated so vibrations from walking don't transmit to the scope.

You may also want provision for personal comfort as I find I spend a lot of time in there at night and it can get cold in winter hence my little control room. I also plan to install a wireless hub but have yet to get that sort of thing to work (tried once already).

You want wall height just right so you get maximum imaging angles and views yet wind protection without the scope sticking out above the walls into the windstream. Your BRC250 is quite short and was very handy that way and not windaffected much. Neither are refractors however it is better they are sheltered from wind. So 2 opposing considerations there - wind protection and viewing angle.

However when you consider you really only want to image an object when it is fairly high up you can waste the first 30 degrees of angle as its useless for imaging anyway.

As far as pier design goes I have no data on concrete versus metal. I chose metal pier as it is portable, easier to install,
and I wanted a professional unit so my Paramount bolted straight onto it. I also wanted an adjustable levelling plate and I wanted it strong and sturdy. Diameter of the steel tube is more important than wall thickness. You go for the largest diameter.
I went for around 300mm diameter as that is quite large. My dark site is 200mm and it seemed to handle up to a 12.5 inch RCOS without being a significant factor in imaging (at least as far as I know - but perhaps there was slight deflection - how to do tell?). It seems to me though that once a GEM is setup and the scope on it is mounted everything is beautifully balanced so there is little reason for the mount to deflect as it is not receiving any sideways pressure except from some slight imbalance that can occur at different angles. Is this correct? I think autoguiding accuracy and acccurate polar alignment and an accurate mount are the key concerns there.

So wind, scope clearance, least light pollution, closeness to neighbours and potential noise (you don't want a clunker of a roll off roof closing at 2am right next to your neighbours window!), best viewing angles with best clear unobstructed view, widest possible pier, floor separate from the pier, deep and heavy concrete pier base to minimise movement and form a solid base, thermally designed so nothing is holding heat and loses heat build up fast, well ventilated to help in that regard plus ease of construction at low cost, operator comfort, cable control and adequate surge protected electricity outlets. I think that sums it up.

You also need to plan where you computers will be so they don't get in the road. My dark site observatory is 3.2 x 3.2 with 2.2 walls and I find a smallish table sometimes gets in the way of my TEC180 with all the cameras hanging off it and have to be a bit careful there. Its over a metre of swing room. Allow 1.2 metres swing room for most scopes. Compound scopes are more compact, refractors are longer. 1.2 metres should be enough for either. Go for a pitched roof not a flat roof as a flat roof won't give enough clearance for the scope without hitting it unless the scope is horizontal.

Greg

Last edited by gregbradley; 27-07-2010 at 01:27 PM.
Reply With Quote
  #29  
Old 27-07-2010, 01:32 PM
renormalised's Avatar
renormalised (Carl)
No More Infinities

renormalised is offline
 
Join Date: Apr 2008
Location: Townsville
Posts: 9,698
Post

Quote:
Originally Posted by sheeny View Post
Just googled it Carl.

100NB standadr weight pipe (Schedule 40) is 114.3mm OD and 6.0198mm wall thickness...


... in theory.

Al.
Thanks Al....I was thinking about the robustness of a pipe and just wanted to know what the standard weight pipes were like. Sounds OK
Reply With Quote
  #30  
Old 27-07-2010, 05:34 PM
Jeffkop's Avatar
Jeffkop (Jeff)
Star-Fishing

Jeffkop is offline
 
Join Date: Jan 2008
Location: Tuckurimba
Posts: 885
Some great advise there Greg ... especially good food for thought concerning the wall height making ssure this will protect the scope from wind. The Obs and warm room are going to be 2400mm square, with the scope room sitting about 4 or five steps up from the warm room. (Sloping ground) So the scope roof will slide over the warm roof.

Unfortunately, I cannot locate the Obs in the most protected spots because trees will severely limit my viewing, so it was to go down a hill a bit and will basically sit out on its own. So the wall height is even more important.

The footing size is interesting. 800x800x900 is around about 1/2 of what I considered doing. Of course I havent started digging yet ... 1500 might not be possible, however you definately have got me thinking about whether I'm going over kill on the depth. If that depth works for you with a PME and an Rcos .. (or have you got your new Planewave on the PME ??) then surely that would be OK for my BRC and Titan. All advise is deeper is better though. I really dont intend to be doing this again so I want to take all steps to get the desired outcome.

The structure is along similar lines as yours too ... pine frame, colourbond external, gable ends too. I want to be able to just close the roof no matter what position the scope is in. Dont want to be hustling around with Parking scope etc if it suddenly starts bucketing or something.
One difference is that Im having the pier come through the floor (yellow tongue)

Went and looked at my mates today. He has a 1250mm length of 220mm x 6mm steel pipe that I'm sure fits the bill nicely. Just means I will have to make sure that I continue the footing above ground level about 200mm Id reckon. I need about 1m from floor level.

I'm not concerned about automation of the roof yet, however if want to head that way later I will design the electronics to facilitate it.

Anyway, thanks for your contribution here Greg it has a wealth of information, when it all starts I will post regular updates in the DIY Obs forum.

I cant wait to get the BRC up and running.

Good to hear from you
Reply With Quote
  #31  
Old 27-07-2010, 06:07 PM
sheeny's Avatar
sheeny (Al)
Spam Hunter

sheeny is offline
 
Join Date: Jun 2005
Location: Oberon NSW
Posts: 14,438
Quote:
Originally Posted by gregbradley View Post

It seems to me though that once a GEM is setup and the scope on it is mounted everything is beautifully balanced so there is little reason for the mount to deflect as it is not receiving any sideways pressure except from some slight imbalance that can occur at different angles. Is this correct? I think autoguiding accuracy and acccurate polar alignment and an accurate mount are the key concerns there.
Yes. I concur.

Some good practical tips there too thanks Greg.

As I've just been discussing with Marc via PM, the most obvious shortcoming a lot of people make with piers is to not grout the base plate. Without grout under the baseplate, it only contacts the high points of the concrete and is free to flex in between. It doesn't take much flexure at the baseplate to be amplified to an optical movement at the top.

Unfortunately I think there are a lot of really robust solid piers out there that probably only perform as well as a much smaller one because of lack of grouting... but unless your scope is exposed to the wind, there should be very little to cause a noticeable movement. Design by luck perhaps...



Al.
Reply With Quote
  #32  
Old 27-07-2010, 09:22 PM
gregbradley's Avatar
gregbradley
Registered User

gregbradley is offline
 
Join Date: Feb 2006
Location: Sydney
Posts: 18,185
That's a very good tip Al. I'll make sure I get some nonshrinking grout to
put my pier on. I did try to level the pier quite thoroughly but as you say there will still be slight high points in the concrete.

Greg.
Reply With Quote
  #33  
Old 27-07-2010, 10:09 PM
renormalised's Avatar
renormalised (Carl)
No More Infinities

renormalised is offline
 
Join Date: Apr 2008
Location: Townsville
Posts: 9,698
Post

Quote:
Originally Posted by gregbradley View Post
That's a very good tip Al. I'll make sure I get some nonshrinking grout to
put my pier on. I did try to level the pier quite thoroughly but as you say there will still be slight high points in the concrete.

Greg.
That's where a good laser level, or a bubble level, would come in handy. Then you could physically measure the concrete for leveling inconsistencies.
Reply With Quote
  #34  
Old 25-01-2012, 02:47 PM
CarlJoseph (Carl)
Registered User

CarlJoseph is offline
 
Join Date: Dec 2009
Location: Dandenong Ranges
Posts: 265
Sorry to dig up an older thread. I hope people don't mind.

I'm about to embark on putting in my first pier and am looking to do something similar to what's described here. I'm no concreter/builder type person (wood is my construction material of choice) so excuse the basic questions I have ...

Quote:
Originally Posted by sheeny View Post
The "right way" to apply the grout is set you pier up level and plumb on the anchor bolts with levelling nuts underneath, then use a good quality non-shrink grout to fill underneath. If your grout is stiff push it in from one side until it comes out the opposite side so you know the joint is full.
I assume in this scenario the levelling threads are embedded into the footing and that the footing is completely cured before you try to apply the grout and level the pier?

I also assume you don't add the nuts to the top of the base plate until everything has set, or do you?

Once levelled and the grout has cured, the levelling nuts are stuck in that position correct?


Quote:
Originally Posted by sheeny View Post
What I did with mine was cast my footing about 20mm lower than floor level. I then made a stiff mortar mix and levelled and smoothed that off to floor level. While it was wet I placed the pier on it and used the anchor nuts to pull the pier down just slightly into the mortar (just enough to make sure there's no air bubbles - not enough to deform the mortar around the baseplate) and adjust the nuts till the pier is plumb and level. Then leave it to cure and make sure is protected from anything that could bump or move it while the mortar sets. After a week of curing tension the anchor nuts up tight
Similar to above, the main footing should be cured before adding the stiff mortar mix to the top?

What's the stop the weight of the pier squishing the mortar or does this plan also have the same "levelling threads/nuts" embedded into the main footing?


Any pictures would also really help me get this through my skull.

Thanks,
Carl
Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +10. The time is now 06:50 PM.

Powered by vBulletin Version 3.8.7 | Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Advertisement
Astrophotography Prize
Advertisement
Bintel
Advertisement