The plan is to build this observatory iteratively
At the end of each stage I can image, adapt what I have done based on what I have learnt, and stop whenever I please if I think I have got the most value that I need from the build.
There are lots of things I could include but I don’t want them to stop me from actually imaging if I don’t do them.
Below is my imaging journey map for the first release.
From Left to Right you see the order that things will be done in and from Top to Bottom you can see the capabilities I can consider.
Everything above the red line is my MVP, (My Minimum Viable Product) that will allow me to image and still add extras if I chose to.
The larger the sticky, the more value it means to me.
The first release covers covers the Pier, Network connectivity and Power. (No walls and no roof! Aka a permanent pier
)
This weekend I hope to get the rebar cage and concrete pour done