Go Back   IceInSpace > Equipment > DIY Observatories

Reply
 
Thread Tools Rate Thread
  #61  
Old 18-05-2013, 09:27 PM
strongmanmike's Avatar
strongmanmike (Michael)
Highest Observatory in Oz

strongmanmike is offline
 
Join Date: May 2006
Location: Canberra
Posts: 17,683
Quote:
Originally Posted by bert View Post
The shutter goes past the zenith a far way in manual shutter. In the auto shutters they do not go as far back.

I think the poster was confused about having an offset when using a fork mount or using a pod type dome with obstructed zenith. With a gem stick it in the middle of the dome. There is a formula for where the declination meets the ra axis as the centre point of the dome... I can't remember where I read it...
Yeh mine is good'ol manual, I had one before and yes the pier was off set for my Meade SCT on fork mount but with my NJP mount I am pretty sure I will be ok with a centred pier

Mike
Reply With Quote
  #62  
Old 19-05-2013, 10:08 AM
Paul Haese's Avatar
Paul Haese
Registered User

Paul Haese is offline
 
Join Date: Jan 2009
Location: Adelaide
Posts: 9,991
Quote:
Originally Posted by strongmanmike View Post
Actually that's a good idea ... what's the life of styrofoam?



Cheers Matt, this was my exact plan and I may stay on this path but lay the plastic cheers



Yes, plastic it is what do you mean by stripping?
Why would I need an offset, I have a GEM isn't that centralised..?

Mike
I meant stripping out the formwork around the pier.

Was thinking it was necessary to have an offset to see the sky at the zenith. I did not know that the dome would already allow for that. Happy to be corrected.
Reply With Quote
  #63  
Old 19-05-2013, 10:44 AM
marc4darkskies's Avatar
marc4darkskies (Marcus)
Billions and Billions ...

marc4darkskies is offline
 
Join Date: Mar 2007
Location: Quialigo, NSW
Posts: 3,143
Yep, pier for a GEM should be in the centre - dome slit goes past zenith. The necessary dome movements as you get to the zenith do get more radical though ... this depends on the geometry/offsets of the mount + scope combo and offsets with respect to the dome.

Cheers, Marcus
Reply With Quote
  #64  
Old 19-05-2013, 01:08 PM
ChrisM's Avatar
ChrisM
Sandy Ridge Observatory

ChrisM is offline
 
Join Date: Mar 2008
Location: Gippsland, VIC
Posts: 768
Mike, I placed a square of 50 mm thick high density foam (from Clark Rubber, and with a circular cutout for the pier)) on top of my pier foundation block prior to pouring the 100 mm thick slab. I did a test before I bought the foam to ensure that the weight of the concrete would not compress the foam.

The foam is there for keeps, and doesn't achieve quite 100% mechanical isolation but it's still pretty good - probably ~90%.

Regarding offsetting the pier, I agree with your thinking that you would just rotate the dome until the opening is above the scope. I offset my pier about 250 mm North because I had a fork-mounted scope originally. Even with that offset and now a much larger scope on a GEM, I can still always find a dome position to get a full look, although as Fred said, there are some pretty radical angles involved!

Chris
Reply With Quote
  #65  
Old 19-05-2013, 03:12 PM
strongmanmike's Avatar
strongmanmike (Michael)
Highest Observatory in Oz

strongmanmike is offline
 
Join Date: May 2006
Location: Canberra
Posts: 17,683
Ok, added the plastic to the base of the form-work...bit windy today (shock horror! ) so made it a bit tricky to get it down ...will trim the plastic a bit more closer to the pour and remember to take out all the weights ..hopefully that day won't be too windy

Thanks for all the tips boys

Chris, not sure what you mean actually..? You put the rubber "on top" of the pier base? Don't get it

Mike
Attached Thumbnails
Click for full-size image (With plastic down and ready for concrete.jpg)
194.1 KB63 views
Reply With Quote
  #66  
Old 19-05-2013, 05:19 PM
ChrisM's Avatar
ChrisM
Sandy Ridge Observatory

ChrisM is offline
 
Join Date: Mar 2008
Location: Gippsland, VIC
Posts: 768
Quote:
Originally Posted by strongmanmike View Post

Chris, not sure what you mean actually..? You put the rubber "on top" of the pier base? Don't get it

Mike
Mike - Unlike your pier foundation, mine was a large concrete block with its top below the circular slab level. There is a tall concrete pier on top of the concrete block, and the high density foam was placed on top of the block (with a cutout for the concrete pier) so that the circular slab, which was poured later, did not rest on the pier block. I will post a picture of the foam in situ when I find one. In retrospect, I think that your design is better in that you have less surfaces to mechanically isolate between the building and pier.

Post #7 shows some general pics of the pier/slab http://www.iceinspace.com.au/forum/s...t=36222&page=4

Chris
Reply With Quote
  #67  
Old 19-05-2013, 05:38 PM
rogerg's Avatar
rogerg (Roger)
Registered User

rogerg is offline
 
Join Date: Feb 2006
Location: Perth, Western Australia
Posts: 4,563
Congrats on the great progress Mike I got a good laugh out of the "idiot on the pier" shot
Reply With Quote
  #68  
Old 19-05-2013, 09:07 PM
allan gould's Avatar
allan gould
Registered User

allan gould is offline
 
Join Date: May 2005
Location: Brisbane
Posts: 4,485
I placed my pier in the exact center of the dome as I have a GEM mount. The slit for the dome opens past the zenith and if you automate the dome and measure everything correctly then when you automate the dome rotation ( not the slit automation) then its a real joy to watch the dome track the scope and it goes perfectly across the meridian. I bit of a laugh as it does a meridian flip but tracks it perfectly. If you do automate the dome then remember to get an ATEN serial to USB connector for the electronics as that's the only one that works -good old yanks (Maxdome) have yet to make it USB.
Allan
Reply With Quote
  #69  
Old 20-05-2013, 05:59 PM
strongmanmike's Avatar
strongmanmike (Michael)
Highest Observatory in Oz

strongmanmike is offline
 
Join Date: May 2006
Location: Canberra
Posts: 17,683
Quote:
Originally Posted by allan gould View Post
I placed my pier in the exact center of the dome as I have a GEM mount. The slit for the dome opens past the zenith and if you automate the dome and measure everything correctly then when you automate the dome rotation ( not the slit automation) then its a real joy to watch the dome track the scope and it goes perfectly across the meridian. I bit of a laugh as it does a meridian flip but tracks it perfectly. If you do automate the dome then remember to get an ATEN serial to USB connector for the electronics as that's the only one that works -good old yanks (Maxdome) have yet to make it USB.
Allan
\

No Automation planned at this stage Allan...but I guess you never know

Mike
Reply With Quote
  #70  
Old 20-05-2013, 06:00 PM
strongmanmike's Avatar
strongmanmike (Michael)
Highest Observatory in Oz

strongmanmike is offline
 
Join Date: May 2006
Location: Canberra
Posts: 17,683
Night before slab pour

It's the night before the concrete arrives, all is ready and weather looks favourable for tomorrow....first concrete slab I have ever attempted (and I am even 1/2 Italian!!) so fingers crossed I get it right

Mike
Attached Thumbnails
Click for full-size image (Night before slab pour.jpg)
138.1 KB53 views
Reply With Quote
  #71  
Old 20-05-2013, 06:03 PM
strongmanmike's Avatar
strongmanmike (Michael)
Highest Observatory in Oz

strongmanmike is offline
 
Join Date: May 2006
Location: Canberra
Posts: 17,683
Quote:
Originally Posted by rogerg View Post
Congrats on the great progress Mike I got a good laugh out of the "idiot on the pier" shot
Gotta have some fun and not take life tooooo seriously...

Reply With Quote
  #72  
Old 21-05-2013, 04:12 PM
strongmanmike's Avatar
strongmanmike (Michael)
Highest Observatory in Oz

strongmanmike is offline
 
Join Date: May 2006
Location: Canberra
Posts: 17,683
Fully fledged Italian now!

Yep, I am now a concrete officionardo Bellisimo!

Took the afternoon off work and Riley and I did the Italian thing....

I remembered that we have a few kangaroos that come in around our house at night and I forgot to plan for this bit ...so a very rudimentary barrier will hopefully deter them

Mike
Attached Thumbnails
Click for full-size image (Wainting for the concrete.jpg)
179.9 KB58 views
Click for full-size image (Concrete in.jpg)
177.8 KB58 views
Click for full-size image (Riley floating.jpg)
164.3 KB59 views
Click for full-size image (Dad floating.jpg)
155.3 KB61 views
Click for full-size image (Finished 2.6m slab.jpg)
158.5 KB70 views
Click for full-size image (Kangaroo fence.jpg)
124.5 KB64 views
Reply With Quote
  #73  
Old 21-05-2013, 04:16 PM
Joshua Bunn's Avatar
Joshua Bunn (Joshua)
Registered User

Joshua Bunn is offline
 
Join Date: Oct 2011
Location: Albany, Western Australia
Posts: 1,486
lookin good Mike. dont let it bake too much in the sun, keep it wet for a few days to cure slowly.

Josh
Reply With Quote
  #74  
Old 21-05-2013, 04:23 PM
strongmanmike's Avatar
strongmanmike (Michael)
Highest Observatory in Oz

strongmanmike is offline
 
Join Date: May 2006
Location: Canberra
Posts: 17,683
Quote:
Originally Posted by Joshua Bunn View Post
lookin good Mike. dont let it bake too much in the sun, keep it wet for a few days to cure slowly.

Josh
It is pretty cold here at the moment, near zero over night and around 15C during the day..?

How and when would you suggest I start wetting it? It's still soft so I was going to wait until it was hard enough not to get water drop marks ie tomorrow morning, or is that too late?

Not a 100% Italian yet...

Mike
Reply With Quote
  #75  
Old 21-05-2013, 04:28 PM
Joshua Bunn's Avatar
Joshua Bunn (Joshua)
Registered User

Joshua Bunn is offline
 
Join Date: Oct 2011
Location: Albany, Western Australia
Posts: 1,486
Quote:
Originally Posted by strongmanmike View Post
It is pretty cold here at the moment, near zero over night and around 15C during the day..?

How and when would you suggest I start wetting it? It's still soft so I was going to wait until it was hard enough not to get water drop marks ie tomorrow morning, or is that too late?

Not a 100% Italian yet...

Mike
use a hose, or even a small sprinkler. when it dries out wet it again. Its not super critical, just to prevent it drying out too fast. tomorrow isnt to late, do make sure the concrete has gone off though - dont want to get onto it to early.

Josh
Reply With Quote
  #76  
Old 21-05-2013, 04:29 PM
Paul Haese's Avatar
Paul Haese
Registered User

Paul Haese is offline
 
Join Date: Jan 2009
Location: Adelaide
Posts: 9,991
Yes tomorrow morning is right for the first wet down. If you can keep it green for two days and use some plastic over the top of the water if you can. It will help prevent cracking. Strip the form on the third day and keep it a little wet for the next day or so after that.
Reply With Quote
  #77  
Old 21-05-2013, 04:46 PM
BC
Registered User

BC is offline
 
Join Date: May 2005
Location: Long Beach NSW
Posts: 214
Hello Mike,

Just a thought, we did a basketball area a couple of years ago at this time of year. We covered it with some plastic and old blankets to prevent any water component freezing before it cures properly. It sounds a bit excessive and may be rubbish but it is forecast for -1 tonight; probably even less out of town.

BTW, I'm really enjoying watching the process and suggestions as I'm planning a ROR obs at the moment, and thus far it's a pretty similar process (except for the shape of the slab!)

Cheers,
Bruce
Reply With Quote
  #78  
Old 21-05-2013, 04:47 PM
strongmanmike's Avatar
strongmanmike (Michael)
Highest Observatory in Oz

strongmanmike is offline
 
Join Date: May 2006
Location: Canberra
Posts: 17,683
Cheers guys

Shivers, I have to get up at 5am (6.30am start) and it will be close to freezing then (if not below) I might be able to get Riley to wet it later in the morning around 11am (when he gets up - he works late) will that do? It is predicted to rain after that anyway.

Mike
Reply With Quote
  #79  
Old 21-05-2013, 04:53 PM
Paul Haese's Avatar
Paul Haese
Registered User

Paul Haese is offline
 
Join Date: Jan 2009
Location: Adelaide
Posts: 9,991
Yeah later in the day is fine. Main thing is to start while the slab is green.

Bruce I has thought of the ice too. Certainly worth putting on some plastic tonight and a blanket over the top.
Reply With Quote
  #80  
Old 21-05-2013, 04:55 PM
strongmanmike's Avatar
strongmanmike (Michael)
Highest Observatory in Oz

strongmanmike is offline
 
Join Date: May 2006
Location: Canberra
Posts: 17,683
Quote:
Originally Posted by Paul Haese View Post
Yeah later in the day is fine. Main thing is to start while the slab is green.

Bruce I has thought of the ice too. Certainly worth putting on some plastic tonight and a blanket over the top.
Wouldn't the plastic and blanket mark the concrete?
Reply With Quote
Reply

Bookmarks

Thread Tools
Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +10. The time is now 10:41 AM.

Powered by vBulletin Version 3.8.7 | Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Advertisement
Bintel
Advertisement