Old 04-04-2014, 05:47 PM
el_draco (Rom)
Politically incorrect.

el_draco is offline
 
Join Date: Apr 2009
Location: Tasmania (South end)
Posts: 2,315
Pier mass

Finally starting to contemplate the hole in the ground. I'm estimating a one tonne + mass at ground level. Does anyone have information on the best way to do this? I am considering a section of Conc. pipe 1m in diameter and about 600 to 900mm deep filled with concrete. I reckon that'll just about sit on bed rock.
Reply With Quote
  #2  
Old 14-04-2014, 09:50 PM
TraKtorman's Avatar
TraKtorman (Peter)
Peter

TraKtorman is offline
 
Join Date: Apr 2011
Location: KRAWARREE
Posts: 64
Pier mass

I dug a 1m by 1m x 1m hole, made a rebar cage. Used a 12" pvc pipe for the pier some rebar in that, then bolted on an adapter for the scope. It is "rock solid" but a lot depends on your soil and rainfall. the concrete pipe seems unnecessary. see happy snaps
Attached Thumbnails
Click for full-size image (_MG_5693.jpg)
135.2 KB103 views
Click for full-size image (Telescope pier hole (12 of 95)-2.jpg)
123.2 KB82 views
Click for full-size image (Telesope May 09 (5 of 44)-2.jpg)
72.0 KB91 views

Last edited by TraKtorman; 15-04-2014 at 07:57 PM.
Reply With Quote
  #3  
Old 16-04-2014, 10:02 PM
ChrisM's Avatar
ChrisM
Sandy Ridge Observatory

ChrisM is offline
 
Join Date: Mar 2008
Location: Gippsland, VIC
Posts: 768
It sounds like your foundations and connections were good if the pier is rock steady.

Have you now finished the observatory? Your fist pic suggests so and it looks pretty flash...

Chris
Reply With Quote
  #4  
Old 20-04-2014, 08:52 PM
TraKtorman's Avatar
TraKtorman (Peter)
Peter

TraKtorman is offline
 
Join Date: Apr 2011
Location: KRAWARREE
Posts: 64
Quote:
Originally Posted by ChrisM View Post
It sounds like your foundations and connections were good if the pier is rock steady.

Have you now finished the observatory? Your fist pic suggests so and it looks pretty flash...

Chris
Well, when is anything finished in this passtime? Yes, is the easy answer, but it has come along a bit since then and no doubt will continue to consume time and money into the future! Regards Peter
Reply With Quote
  #5  
Old 21-04-2014, 06:39 PM
Paul Haese's Avatar
Paul Haese
Registered User

Paul Haese is offline
 
Join Date: Jan 2009
Location: Adelaide
Posts: 9,991
1 cubic metre of concrete is equal to 2.4 tonne of concrete. So you will be well over a tonne with the size hole you are talking about.
Reply With Quote
  #6  
Old 21-04-2014, 06:53 PM
Bassnut's Avatar
Bassnut (Fred)
Narrowfield rules!

Bassnut is offline
 
Join Date: Nov 2006
Location: Torquay
Posts: 5,065
Quote:
Originally Posted by TraKtorman View Post
I dug a 1m by 1m x 1m hole, made a rebar cage. Used a 12" pvc pipe for the pier some rebar in that, then bolted on an adapter for the scope. It is "rock solid" but a lot depends on your soil and rainfall. the concrete pipe seems unnecessary. see happy snaps
This is pretty much what I did once (without the rebar), I recon its about ideal. A wider pipe is a bit over the top and could be worse with the weight causeing more saging in the ground (if not on rock).
Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +10. The time is now 12:54 AM.

Powered by vBulletin Version 3.8.7 | Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Advertisement
Bintel
Advertisement