Go Back   IceInSpace > Beginners Start Here > Beginners Talk
Register FAQ Calendar Today's Posts Search

Reply
 
Thread Tools Rate Thread
  #1  
Old 22-11-2008, 03:35 PM
Dennis G
Dennis G

Dennis G is offline
 
Join Date: Jan 2007
Location: Albany West Aust
Posts: 213
Platform Drive And Telescope Bearings As Requested

Fig 1 The Motor drive to the platform uses ¼ inch whitworth threaded shaft and half nut to transfer the required energy to move the equatorial platform on which the telescope is mounted Fig 2. Owing to belt slip in cold weather I rebuilt the original drive using a 12 pitch worm and worm wheel to drive the threaded shaft. This and the Dick Smith pulse drive controller has proved most satisfactory. One very important modification is the ball joint that connects the half nut to the slotted yoke attached to the top board of the platform. This arrangement provides a smooth friction free drive, which the pin in a simple yoke did not provide. The ball fitting is available at bearing supply stores. The yoke is fabricated with a number of aluminium sections and lubricated to provide the ball attachment with a smooth sliding action. Another modification worth mentioning is rubber dampening to the attachment of the motor drive to the platform base. This dampens out any vibration, which can reflect in the final captured image.
Disappointed with Teflon slides and after numerous methods to over come stiction to the initial movement, both in the elevation and rotation of the scope, I installed bearings and now have a 99% perfect system. Figs 3 and 4 three-part construction of the ball rollers running on Formica glued to the scope’s base. Three of these bearings provide a smooth turning motion whereas the elevation bearings Fig 9 (4 of) are 20 mm dia sealed ball races with metal faced side bearings. These have made elevation movement really smooth, but it requires more precise balance weights to accommodate the change in the angle of elevation. No hardship to change weights for what one receives in a smooth movement.
Figs 5 and 6 show the locking down of the platform for transport and storage. Just a few minutes to return the platform to centre and raise the four supports into the slotted plates that position them while lifting the upper section off the main platform equatorial bearings. The four metal threads are screwed down to finally lock the platform.
Fig 7 The Dick Smith pulse control kit encased. Fig 8 Remote focus control.
Please feel free to ask questions if I haven't provided sufficient information. I'd like to receive your comments. this includes the Remote Focus submission.
Attached Thumbnails
Click for full-size image (PLATFORM DRIVE UNIT 1.jpg)
81.1 KB41 views
Click for full-size image (MOTOR AND WORM DRIVE.jpg)
51.3 KB28 views
Click for full-size image (BASE ROTATION BEARING 1.jpg)
51.7 KB23 views
Click for full-size image (LOCK DOWN 1.jpg)
52.3 KB24 views
Click for full-size image (LOCK DOWN 3.jpg)
57.9 KB23 views
Click for full-size image (PLATFORM CONTROL.jpg)
60.0 KB23 views
Click for full-size image (FOCUS CONTROL.jpg)
73.4 KB18 views
Click for full-size image (LEFT SIDE REAR ELEVATION BEARING.jpg)
79.1 KB25 views
Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +10. The time is now 05:52 PM.

Powered by vBulletin Version 3.8.7 | Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Advertisement
Bintel
Advertisement