starting of my scope pier

well with permission from the minister for war and finance giving the go ahead for the pier and deck in the back yard, ground was broken, steel pipe lugged home and cement stacked in the trailer, first aid box stocked, let the blood, sweat, tears and a few choice words begin.
will attached a few pics as it rolls along.
jinxsta.
Reply With Quote
  #2  
Old 06-04-2008, 04:22 PM
jinxsta's Avatar
jinxsta
Registered User

jinxsta is offline
 
Join Date: Dec 2007
Location: coomba
Posts: 57
ground broken

ground broken, then getting bigger.
Attached Thumbnails
Click for full-size image (scope 002.JPG)
196.7 KB42 views
Click for full-size image (scope 005.JPG)
179.7 KB53 views
Reply With Quote
  #3  
Old 06-04-2008, 04:31 PM
jinxsta's Avatar
jinxsta
Registered User

jinxsta is offline
 
Join Date: Dec 2007
Location: coomba
Posts: 57
pier size

the size of the pier is 7 foot long, 6 inches inside diameter,its a peice of line pipe I picked up for $60 as a bit of scrap, the hole is 3 1/2 foot deep 2 1/2 foot square.
Attached Thumbnails
Click for full-size image (scope 008.JPG)
161.5 KB86 views
Click for full-size image (scope 009.JPG)
164.8 KB80 views
Reply With Quote
  #4  
Old 06-04-2008, 04:38 PM
jinxsta's Avatar
jinxsta
Registered User

jinxsta is offline
 
Join Date: Dec 2007
Location: coomba
Posts: 57
hand mixing concrete

well it took 20 x 20 kg bags of cement mix to fill that hole back in and my arms and back is killing me but will be well worth it.
Attached Thumbnails
Click for full-size image (scope 014.JPG)
141.9 KB85 views
Click for full-size image (scope 012.JPG)
193.4 KB93 views
Reply With Quote
  #5  
Old 08-04-2008, 06:52 AM
I.C.D (Ian)
Registered User

I.C.D is offline
 
Join Date: May 2006
Location: Wattle Ponds via Singleton
Posts: 615
jinxsta
How are you going to mount the scope to the pier by welding or bolts
Reply With Quote
  #6  
Old 08-04-2008, 06:53 AM
iceman's Avatar
iceman (Mike)
Sir Post a Lot!

iceman is offline
 
Join Date: Sep 2004
Location: Gosford, NSW, Australia
Posts: 36,799
Wow, fantastic. What a great backyard to be able to do that.

Are you going to wrap an observatory around it?

What scope are you putting on it?
Reply With Quote
  #7  
Old 08-04-2008, 08:28 AM
Garyh's Avatar
Garyh
Amongst the stars

Garyh is offline
 
Join Date: Jun 2006
Location: Glen Innes, N.S.W.
Posts: 2,888
Now thats some concrete block there. You must have plans for a big scope!
Hope the waethers better your way than here at the moment!
cheers Gary
Reply With Quote
  #8  
Old 08-04-2008, 09:32 AM
h0ughy's Avatar
h0ughy (David)
Moderator

h0ughy is offline
 
Join Date: Apr 2005
Location: NEWCASTLE NSW Australia
Posts: 33,378
what a worthwhile project!!!
Reply With Quote
  #9  
Old 08-04-2008, 08:02 PM
eqcradle
Registered User

eqcradle is offline
 
Join Date: Apr 2007
Posts: 31
Nice soil! I'd need a jackhammer to get a hole like that in my lawn.

CL.
Reply With Quote
  #10  
Old 10-04-2008, 08:41 PM
jinxsta's Avatar
jinxsta
Registered User

jinxsta is offline
 
Join Date: Dec 2007
Location: coomba
Posts: 57
thanks guys the scope is an 8 inch reflector which will have an gstar exc attached to it when I get the order in.
the bolts will be cemented in but have an idea to bend and weld the end together so it won't pull out.
will start on the deck and maybe some sort of observatory not sure yet wich way to go yet but will have about 8 foot by 7 foot deck to play with.
Reply With Quote
  #11  
Old 10-04-2008, 09:36 PM
shane shaw
Registered User

shane shaw is offline
 
Join Date: Mar 2007
Location: LANDSDALE, WESTERN AUSTRALIA
Posts: 65
nice job there mate. Keep the photos coming and keep us up to date looking forawrd to seeing the building continue.
Reply With Quote
  #12  
Old 11-04-2008, 11:58 AM
jinxsta's Avatar
jinxsta
Registered User

jinxsta is offline
 
Join Date: Dec 2007
Location: coomba
Posts: 57
ok got a little more work done today before the rain.
have the plates and bolts sorted just need some good weather to
start cementing.
I welded the bent bolts together and welded rod spacers to keep bolts in place while pouring cement and will add reo down the middle to keep cement together just in case I ever get a bigger scope down the track.
Attached Thumbnails
Click for full-size image (scope4.jpg)
132.2 KB56 views
Click for full-size image (scopeplate.jpg)
97.1 KB56 views
Click for full-size image (scope3.jpg)
134.1 KB61 views
Reply With Quote
  #13  
Old 12-04-2008, 05:14 PM
jinxsta's Avatar
jinxsta
Registered User

jinxsta is offline
 
Join Date: Dec 2007
Location: coomba
Posts: 57
another update and some pic's.
a little more cement some paint and a trial fit.
will start on the decking and then can't wait for some clear skies.
Attached Thumbnails
Click for full-size image (paintpole.jpg)
91.9 KB70 views
Click for full-size image (paintpole1.jpg)
149.2 KB84 views
Click for full-size image (paintpole2.jpg)
147.9 KB91 views
Reply With Quote
  #14  
Old 18-04-2008, 06:39 AM
jinxsta's Avatar
jinxsta
Registered User

jinxsta is offline
 
Join Date: Dec 2007
Location: coomba
Posts: 57
Another update and a couple more photos.
Have done the decking between rain showers and the next thing will be a handrail and then have to work out some sort of cover for the scope.
but all in all I'm chuffed with the way it has come along.
Attached Thumbnails
Click for full-size image (pierdeck1.jpg)
196.2 KB51 views
Click for full-size image (pierdeck2.jpg)
146.1 KB54 views
Click for full-size image (pierdeck3.jpg)
127.6 KB67 views
Reply With Quote
  #15  
Old 18-04-2008, 06:44 AM
iceman's Avatar
iceman (Mike)
Sir Post a Lot!

iceman is offline
 
Join Date: Sep 2004
Location: Gosford, NSW, Australia
Posts: 36,799
Looking awesome!
Reply With Quote
  #16  
Old 18-04-2008, 11:10 AM
Ian Robinson
Registered User

Ian Robinson is offline
 
Join Date: Jan 2007
Location: Gateshead
Posts: 2,205
Quote:
Originally Posted by jinxsta View Post
well it took 20 x 20 kg bags of cement mix to fill that hole back in and my arms and back is killing me but will be well worth it.
That's a lot of concrete.

Question : the idea of the 2 small metal fins welded to the tube is ?
Reply With Quote
  #17  
Old 18-04-2008, 11:24 AM
Ian Robinson
Registered User

Ian Robinson is offline
 
Join Date: Jan 2007
Location: Gateshead
Posts: 2,205
Quote:
Originally Posted by jinxsta View Post
Another update and a couple more photos.
Have done the decking between rain showers and the next thing will be a handrail and then have to work out some sort of cover for the scope.
but all in all I'm chuffed with the way it has come along.
Filling the tube with concrete is probably overkill .... if it's thick enough metal it would be plenty solid enough.

If I had been doing this I would have left the tube hollow , can put power and data and computer cables inside it that way (If needed later) , I would have capped the tube's top with nice thick piece of steel plate , with the levelling bolts pre welded to it.

Anyway , not too shabby a job .

PS : roughly how much did the materials for your pier and platform set you back roughly ?

You can do mine now .
Reply With Quote
  #18  
Old 18-04-2008, 11:49 AM
jinxsta's Avatar
jinxsta
Registered User

jinxsta is offline
 
Join Date: Dec 2007
Location: coomba
Posts: 57
Thanks guys for the comments.
Ian the fins on the bottom of the metal tube where to stop the tube from spining in the cement, and filling the tube with cement was so I could hold the bolts for the plate and to stop the tube from vibrating and sounding like a bell when it was it was tapped.
so far costs are.
approx
$150 concrete mix bags including the bags for the posts
$200 for timber
$60 for tube got it at scrape price
$50 in nails bolts etc.

thats about it so far and haven't started on the handrail yet.
Reply With Quote
  #19  
Old 18-04-2008, 10:16 PM
Ian Robinson
Registered User

Ian Robinson is offline
 
Join Date: Jan 2007
Location: Gateshead
Posts: 2,205
Quote:
Originally Posted by jinxsta View Post
Thanks guys for the comments.
Ian the fins on the bottom of the metal tube where to stop the tube from spining in the cement, and filling the tube with cement was so I could hold the bolts for the plate and to stop the tube from vibrating and sounding like a bell when it was it was tapped.
so far costs are.
approx
$150 concrete mix bags including the bags for the posts
$200 for timber
$60 for tube got it at scrape price
$50 in nails bolts etc.

thats about it so far and haven't started on the handrail yet.
I see , should have thought of that. (the fins).

The fill could have been sand too. At least it wont blow away or bend in a cyclone or a flood.
Reply With Quote
  #20  
Old 18-04-2008, 10:45 PM
Matty P's Avatar
Matty P (Matt)
Star Struck

Matty P is offline
 
Join Date: Nov 2007
Location: Canberra
Posts: 2,797
A very cool project Jinxsta. Looking very good.

Thinking about doing the same thing myself. Probably wont happen though.
Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +10. The time is now 01:47 PM.

Powered by vBulletin Version 3.8.7 | Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Advertisement
Bintel
Advertisement