So far I have in the last few weeks....
- Put in extra metal struts in the walls to hold the lining. 5 lengths of 6m 40mm galv-tube, cut to size
- Put in insullation - stuff that has sizilation on one side and 40mm pink bat on the other side
- Put on the HardiFlex lininig
I've got some touching up to do on the HardiFlex, some gap filler required and a couple of extrea pieces to patch up holes that were mis-calculations.
Then it's on to the fun part, the painting!
Also having a new curtain made for between open & closed halves, a heavier full block-out one that will provide better insullation than the current rather thin one.
The HardiFlex job is far from perfect but it will do. There were some very awkward angles and corners etc. So it doesn't meet up perfectly in all the joins. I won't notice once it's gap-filled and painted though I think.
Looking forward to having it done, the observatory is a mess, the PC isn't running nice and needs attention (but not practical in it's current physical state, and lots more.
Progress. Taken about 4 weeks so far.