PKay
06-01-2021, 07:49 AM
Nearing completion, all I need is for it to stop raining and the roof can go on
I have used Versa panel (50mm) for the walls and Versa link (100mm) for the roof. Both have excellent insulation properties.
The roof is mounted on a metal framed carriage that rolls.
It is locked in place by 4 latches.
The side door slides open on a overhead door track.
The concrete pier is detailed in earlier post.
I have used Versa panel (50mm) for the walls and Versa link (100mm) for the roof. Both have excellent insulation properties.
The roof is mounted on a metal framed carriage that rolls.
It is locked in place by 4 latches.
The side door slides open on a overhead door track.
The concrete pier is detailed in earlier post.