Quote:
Originally Posted by Bassnut View Post
This is very interesting, Im looking now to do something similar. I notice you have it on a concrete path. I found in my situation, with the same concrete pathway, that what appears like separate slabs is just a continuous pour path with 10mm slots cut in it which Im thinking is enough stable mass just to bolt a pier to the path instead of a tedious 1 m or so cubic separate concrete block for the pier. What are you going to do?.
Yes Fred. A bolt-down pier with a 300x300 base into a 100mm path and concrete apron should be quite adequate for scopes of my size. I hope.