Well then..
It’s been 21 months since the pier went in and not much has happened since.
It’s been a challenging couple of years but it’s game on for 2023.

The frame for the deck has finally been started. It’s quite a steep slope so it will be a raised deck.

On top of this there will eventually be a quite small roll off Obsy cunningly disguised as a woodshed (design signed off by CFO) with a bench area on the deck for looking down the valley and will incorporate into the deck a pad for the Dob based on the Oil drum idea below.


The goal for this iteration therefore is finish the deck and so be able to use and store my Dob.