View Single Post
  #57  
Old 26-02-2015, 09:56 PM
h0ughy's Avatar
h0ughy (David)
Moderator

h0ughy is offline
 
Join Date: Apr 2005
Location: NEWCASTLE NSW Australia
Posts: 33,160
thanks Al, and thanks for having the discussion we did this afternoon.

OK i am having a thought - right out of left field.

due to the presence of snakes, rabid insects and the crappy ground i am on i was thinking something unthinkable - pouring the whole dome slab as an integral pour, being over 6 tons or just on 2.5 cubic metres. the dome just bolts to the concrete? am i nuts?
Reply With Quote