View Single Post
  #19  
Old 25-09-2021, 12:15 PM
Paul Haese's Avatar
Paul Haese
Registered User

Paul Haese is offline
 
Join Date: Jan 2009
Location: Adelaide
Posts: 9,944
More developments at Swan Reach Imaging.

First up we finally have engineering drawings of the ROR shed, wind calculations and engineering calculations. All have been submitted to council for approval. Some of the drawings are attached to this post. The shed will be 9.1m long and be a total height of 2.3m high. Expected installation will be sometime in December now. Certainly greatly delayed from our original notifications, however the industry is very busy and our location is remote.

Second, we now have a system installed in the dome and will now need to do the dialling in to get it ready for imaging. It will shortly have an FSQ106 sitting on top with a STL11002. With any luck this time next week we will have imaging commencing on site.
Attached Thumbnails
Click for full-size image (AG12 with QSIWSG-8.jpg)
64.7 KB182 views
Click for full-size image (IR of dome.jpg)
45.9 KB151 views
Click for full-size image (IMG_E7705.jpg)
96.4 KB164 views
Click for full-size image (IMG_E7706.jpg)
183.3 KB126 views
Click for full-size image (IMG_E7707.jpg)
197.8 KB148 views
Reply With Quote