View Single Post
  #12  
Old 23-11-2021, 06:07 PM
Startrek (Martin)
Registered User

Startrek is offline
 
Join Date: Dec 2017
Location: Sydney and South Coast NSW
Posts: 6,057
Quote:
Originally Posted by pmrid View Post
Thanks for your careful guidance. Purely by luck, I already have a 5 x 4.5 mm flexible coupling so I will be spared that part of the process. I find I have a box full of various sizes of couplings left over from days long ago when I was messing about with DIY Arduino focuser control projects.

I am still waiting for Bintel to get my ZWO EAF into stock. It’s been a slow process.
Glad to help
Waiting for Astro gear in the last 18months has been painfully slow , but as long as when you receive it , it’s the correct item and in good condition with nothing missing , that’s the main objective
I waited nearly 9 months for my NexDome to arrive from Canada, everything was spot on when I eventually received it.Imagine if a panel was missing , I’d be still waiting 6 months or longer to finish building it
Reply With Quote