View Single Post
  #2  
Old 26-10-2012, 05:07 PM
bojan's Avatar
bojan
amateur

bojan is online now
 
Join Date: Jul 2006
Location: Mt Waverley, VIC
Posts: 7,108
This is what I did.
http://www.iceinspace.com.au/forum/s...highlight=pier
The pier is bolted onto concrete slab, 0.65m deep and 0.4m in diameter, formed by pouring concrete into a hole in the ground.
The 6 bolts (M10x160mm) were inserted into fresh concrete and set.
Reply With Quote