Backdeck obs initial pics

Greetings, now have pier and pier footings. Mine is a two stage design which will be sandwiched with 5mm industrial rubber gaskets. The bottom half should go under the deck to allow use of deck if needed for other things, until I get my obs over it.
Concrete man seems to have coated the lower part of my bolts with concrete- any tips on getting this off?
Bolts will be cut to about 4 inches above the surface of the pad.
Pics here..http://www.flickr.com/photos/61197697@N00/7470528474/

Graham
Reply With Quote