Hello to all.
Just thought I'd add my 2 cents worth, I'm new here and this is my first post.
I rent the house I live in so no permanent structures allowed. This was my idea.
Using a 14ft trampoline frame and replacing the springs and mats with yellow tounge flooring, with a bit of frame work underneath. Then to cut a hole in the centre of said flooring. using a 600mm x 600mm concrete paver on the ground and a plinth from a garden supply shop, I can put my Dob on that, so it is independant of the floor.
The trampoline frame has poles that would normally hold up the netting. I replace the netting with something a little heavier.
All up the job comes in under $400. Now I.
just have to work on the pesky roof
Does anyone foresee any problems with this that I have not?
P.S Great site. I've learned a heap just visiting.
|