So this shows the pier footing build primarily.
The hole is 1400mm deep and 800x800mm square. The threaded rod cage was mounted slightly above the boxing to allow us to trowel underneath, and we got the 0.9 cubic metres of concrete in relatively easy (this was a 40 degree day, and within a week, would not have been able to get a truck up there).
Also dug a trench from the house to the pad area to have 2 runs of conduit, one for power and one for CAT6 ethernet. I had already run conduit under the whole thing before I filled it in (forgot to mention that in the previous post)
Also decided to come out near the corner to put in a sub-board for future use. The run from the house power goes back to the meter on it's own 20A circuit running 6mm thick wire (rather than the standard 2.5). Leaves me some wiggle room should I ever want to run high power equipment in the shed.
|