Quote:
Originally Posted by scagman
...I will have to do some testing to see if there is any vibrations. I will be putting in a raised floor and isolating that from the pier/mount, so if I can get away without the pier block that would be good(less cost)(even better, less work).
Cheers
|
I'm doing the 'raised floor' isolation for 'SkySlab'. I'm sitting on an estimated 10 tonne slab attached to volcanic rock which if it moves I'm going to be running !!

I've secured my sewer pipe pier with M12 threaded rod through the concrete base. We'll see how it goes. I'd suggest you try first, you can always modify it later, looks like plenty of room in 'The Tank' to bring in power tools.
Keep us posted and have fun !!