Quote:
Originally Posted by Poita
The failure of the two star align makes me think that you have the date in DD/MM/YYYY format instead of MM/DD/YYYY.
|
Thanks for the posts Peter.
I can confirm that it is MM/DD/YYYY. This is the first thing i checked.
I also tried the simulator. The amount of movement needed was more than i expected but i was able to align it. Next time i am out ill take a photo of the mount. I am starting to think that maybe my leg isn't pointing at the correct location. Something else to double check.
Sadly its showers forcast for the next seven days so will be awhile before i can get back out there.