Quote:
Originally Posted by jenchris
cut was about 300 and fill was the same (so I didn't have to supply or dump material!).
My lack of muscle meant I minimised the pad too - and my poverty stopped me using a full concrete pad!
|
I ear in clay soil you can reuse clay blocks and mix them with the concrete to minimize the number of concrete bags you'd use. Even stones, broken bricks whatever fill I suppose. It's just a slab for a nice finish. Not structural.