My little pied a ciel
Decided I needed to put up an observatory or I'd never make use of the short hours we've had this last year - if it's all set up, I can just go and turn it on - easy.
So 2 weeks ago I set a pier - it's a high pressure water main 200 ID which I filled with concrete and rio (I put a 100mm pipe in the centre to save me some concrete but that won't upset anyone strength wise.
Last week after I'd toiled leveling the pad it started raining so I made use of the easier digging!
I set the concrete edges and covered them - then put up the shed later in the week.
Now it has the slides and wedge on and I'm lining it out.
The floor is drying out and once it is dry, I'll install a wooden floor.
Here's the pics
|