Further to my last
The trades involved:-
On the mast: Me supervising
Rigger to undo the large bolts.
Electrical fitter to remove the aerial
With the crane: Crane driver
Crane driver foreman
Electrical superviser because the crane needed to go
past the limit stops to plumb the height.
Dog man in the box
Rigger
Crane chaser on the ground
Barry
|