Leon Wrote
Quote:
why not have your hole ready buy your pier tube long enough to have the top end to the height you want and the bottom end into the hole, brace it level, and then fill the hole to ground level with cement, and the tube as well
|
That's what I did - a lot easier than making up all those bolts and webs!
The biggest flex I get on my rig is the forks (because I'm using a wedge and a LX90) I put a wire backstay on the pier to detune it.