Quote:
Originally Posted by GrampianStars
Starting production in Oct 2011 
|
Well, that's a 4 month wait, which is normal.
I didn't know they had a 14" in the pipeline, but I did know they had a 1.5m and a 2.5m scope designed and ready to build. The 1.5m was to be produced as an on order commercial proposition, the 2.5m on special order basis only.