Quote:
Originally Posted by TrevorW
I was supplying the material for the shaft which only needed to have a thread and maybe a counterweight stop made up for it
|
Point of order... Trevor was supplying everything. Any machine shop worth its salt would be able to do this with minimal effort. Arguing setup etc is ridiculous, as setup time is practically non-existent.
Thus, I would still argue that A$350 is too much.
OIC!
P.S. for comparison, the machine shop I use charges U$20/hr for "analysis" U$55/hr on the machine.