Okay last pic of today's work. lined up the two uprights, closest to the cubby house, these will act as the main uprights where everything comes off, including the door (which has already been manufactured, so they have to be pretty close. These are now ready to accept concrete, which will hold them in place... Will do this later this week... The height of them will be 1500mm all the way around, which gives me about 50mm from the height of the ground, perfect for when I put cement inside it. The Pier is now at a height of 950mm, which is perfect! There is a 950mm hole below it..
|