I now have a few pictures.

One of the observatory without the roof yet and not 100% finished off:

http://www.pbase.com/gregbradley/image/124516712

One of the pier which is 1 metre deep and full of reo and the other pad 2m x 2ms; - sorry about the angle.

http://www.pbase.com/gregbradley/image/124516778

I have curved roofing sheets ready to be installed as a roll off roof once I finish installing the tracks and a bit more cladding and flashings.
It is probably only a couple of days work to wrap it up and be operational.

I intend putting pavers on the floor, a solar operated airvent, a screen door enclosure for the warm room so no mozzies and power and lights.
Perhaps even an electric rolloff roof solution. I chose curved roofing sheets to allow clearance of the scope hopefully in any position (yet to be proven) which makes it quite a bit safer having had one scope clip a roof before.

Greg.