View Single Post
  #28  
Old 05-01-2010, 09:48 PM
h0ughy's Avatar
h0ughy (David)
Moderator

h0ughy is offline
 
Join Date: Apr 2005
Location: NEWCASTLE NSW Australia
Posts: 33,429
day two

well i am absolutely buggered. I had mega help today from my brother in law and Alan Meehan. A lot got done!!!! ran the Data cables, and the power cables, dug a few trenches and broke out a concrete path. A great way of using 2m3 of concrete LOL - the extra becomes instant roundup....

So - i have used 32MPa 10mm mix - the pier was done in a complete pour - thats why there are the retaining wall bricks on top to keep it from rising - forgot to tie it off to the reo - note must remember that if ever i get to do it again

it was pretty hot work, but rewarding.

all that is left now is to run the floor supports and then start drilling and screwing the decking on.
Attached Thumbnails
Click for full-size image (IMG_0758.jpg)
196.1 KB183 views
Click for full-size image (IMG_0759.jpg)
122.7 KB173 views
Click for full-size image (IMG_0760.jpg)
197.5 KB170 views
Click for full-size image (IMG_0765.jpg)
194.2 KB173 views
Click for full-size image (IMG_0767.jpg)
201.7 KB174 views
Click for full-size image (IMG_0768.jpg)
193.4 KB179 views
Click for full-size image (IMG_0769.jpg)
176.9 KB186 views
Click for full-size image (IMG_0774.jpg)
193.5 KB189 views