View Single Post
  #15  
Old 07-11-2009, 08:26 PM
bkm2304's Avatar
bkm2304 (Richard Brown)
Heads Up!

bkm2304 is offline
 
Join Date: Jan 2007
Location: Glen William, NSW
Posts: 625
Today we welded the base of the observatory together. The biggest challenge was making the base ring as circular as possible. It took a couple of hours to get it right. Then the level of the top ring was a challenge! The base cylinder will be covered with corrugated iron and the dome will be covered in .4mm flat gal.
Attached Thumbnails
Click for full-size image (DSC_1483_800x532.JPG)
186.0 KB88 views
Click for full-size image (DSC_1488_800x532.JPG)
196.5 KB112 views
Reply With Quote