I'm not up with surveying, but I remember a few years back the company I worked for was changing to a Geocentric system from the old one (whatever that was). I noticed that there was a note with all older drawings saying that the positions given could be 200m+ out using the new system. Perhaps that's the reason for the discrepancy.
Bill
|