View Single Post
  #8  
Old 13-04-2009, 09:18 PM
h0ughy's Avatar
h0ughy (David)
Moderator

h0ughy is offline
 
Join Date: Apr 2005
Location: NEWCASTLE NSW Australia
Posts: 33,429
Well what a day - bit the bullet and got stuck into it.

I take to woodwork like a lead weight floating on water - its not a natural LOL.

OK screwed and glued two sheets of 25mm structural ply together, did that last night as it was dry this morning.

first thing i did was mark it all out and position the pier for a look.

then realising the jigsaw blade was a bit challenged for the thickness of the ply i went to bunnings - got some more hardware and longer blades and some white spray paint for another project - repainting the black stella seat white so you can see it in the dark.

back to this - it was damn hard to keep a straight cut but i did my best. after cutting the shape out then fitted the pier for a look and was in awe..... simple amazes me that i was able to do this woodwork - i am woodwork challenged

Al came over late in the arvo and gave me a hand fitting the feet and "product testing with the mount and setting it up roughly. Al will be making me up some resin feet with 6 200mm bolts i bought that also fit the furniture feet i installed - for setting up on really uneven ground.

anyway I will do a little more tweaking and install two more feet to the left and right of the pier in the middle - so that it will be a fully supported platform whether i need it or not
Attached Thumbnails
Click for full-size image (_MG_5871.jpg)
170.7 KB36 views
Click for full-size image (_MG_5872.jpg)
161.5 KB29 views
Click for full-size image (_MG_5873.jpg)
140.5 KB24 views
Click for full-size image (_MG_5874.jpg)
123.8 KB30 views
Click for full-size image (_MG_5876.jpg)
168.1 KB35 views
Click for full-size image (_MG_5878.jpg)
128.4 KB40 views

Last edited by h0ughy; 14-04-2009 at 07:38 AM.
Reply With Quote