View Single Post
  #11  
Old 18-01-2009, 12:24 PM
Lester's Avatar
Lester
Registered User

Lester is offline
 
Join Date: Jan 2006
Location: E.P. S.A.
Posts: 4,963
Thanks Ron.

I finished the frame welding yesterday. I have had to wait for the wind to subside, as welding in this dry area isn't something I like doing, even with a good fire break around. The wind can blow sparks for many metres especially when welding over 2 metres above ground.

The roof frame is supported by 8 poly wheels each with a carrying capacity of 50kgs. At each end of the wheel assembley there is a smaller 40kg wheel fixed horizontally to stop any crabbing and jamming.

Next is to fix the colour bond cladding.
Attached Thumbnails
Click for full-size image (framefinished1.jpg)
46.3 KB67 views
Click for full-size image (framefinished2.jpg)
57.9 KB68 views
Click for full-size image (framefinished3.jpg)
51.2 KB62 views
Click for full-size image (framefinished4.jpg)
42.1 KB65 views
Reply With Quote