View Single Post
  #28  
Old 07-11-2008, 10:06 AM
sheeny's Avatar
sheeny (Al)
Spam Hunter

sheeny is offline
 
Join Date: Jun 2005
Location: Oberon NSW
Posts: 14,437
The Pier is Set

A little more progress today... I set the pier.

The photo shows the little slab extension where the door will be that I cast a few weeks ago as well. I figured the last thing I want to be doing is negotiating a step as well as the low door either in the dark or carrying any heavy astro gear...

The pier is sitting on a 20mm bed of stiff mortar. Leveled it off, slipped the pier on and used the bolts to pull the pier down plumb. After the mortar cures, I'll tighten the anchor bolts to final tension. Should give a nice solid joint to the pier footing.

Al.
Attached Thumbnails
Click for full-size image (PB077379web.jpg)
199.4 KB141 views

Last edited by sheeny; 07-11-2008 at 12:42 PM.
Reply With Quote