View Single Post
  #22  
Old 17-10-2008, 10:11 PM
stephenb's Avatar
stephenb (Stephen)
Registered User

stephenb is offline
 
Join Date: Sep 2008
Location: all over the shop...
Posts: 2,098
Mirror cell completion.

Today I successfully completed the mirror cell by fitting +-45 side pins and the top pin with the PVC dowel and stainless steel fittings and mirror clips, and I added the two split pins for a sling for peace of mind. I am undecided if I will actually use it. All these pin assemblies were kindly custom-made for me by Peter Read of SDM Telescopes. I also cut some thin Kydex strips to connect the pivot bars, and adhered them with double-sided foam tape. The flotation mirror cell is now officially complete.

Secondary cage rings and struts.

Also today I cut the secondary cage rings out of A-A grade 20mm 9-ply. I then screwed them together and ran the plunge router around the inside radius to ensure that both internal radii match.

I also cut the secondary cage struts form 25mm aluminium extruded tube and fitted the captive threaded nuts inside each end.

Next week, the focuser board and varnishing the timber...
Attached Thumbnails
Click for full-size image (020 - mirror cell front.JPG)
36.8 KB49 views
Click for full-size image (021 - mirror cell rear.JPG)
37.3 KB44 views
Click for full-size image (022 - secondary cage rings and struts.JPG)
30.1 KB32 views

Last edited by stephenb; 18-10-2008 at 05:44 AM. Reason: corrected punctuation
Reply With Quote