The mods to the Dob have Started
Well its a week since my GSO 12' arrived and the mod's have started, the first finished one is the dew shield for the finder with red led illumination. The second major mod is a new base board with wheels and leveling pads, should be finished this weekend.
Parts list for the Dew Shield.
4. red 3mm leds (DSE).
1. 2 X AA dattery holder (DSE).
1. Drink shaker from the kitchen.
matt black paint.
Gaffer tape.
|