Quote:
Originally Posted by JimmyH155
us Engineers do to secure pumps onto base plates. Use a minimum of 5 times as much concrete as the whole scope weighs (ie if it weighs say 50 kg, then use concrete 5 x 50 = 250 kg of concrete, or roughly 0.25 cubic metres (thats a cube of 630mm x630mm x 630mm.
|
The density of concrete is around 2.3g/cc, so 250kg of concrete takes up much less volume than 0.25 cubic metres - more like 0.1 cubic metres.....