In answer to your question about the moisture levels when the pier was built, the ground was quite wet, the footing went down one meter, by about 600mm square, than the 300mm round pier is on top of this, with a 6 inch square steel tube, 6mm thick running through the center right to the top of the pier, to the bottom of the footing.
Leon
|