View Single Post
  #2  
Old 02-12-2007, 08:31 PM
Dennis
Dazzled by the Cosmos.

Dennis is offline
 
Join Date: May 2005
Location: Brisbane
Posts: 11,823
For the only concreting job that I have ever done, a crazy paving patio back in the UK, I filled the base with rubble (100mm depth) and then I put a layer of builder’s sand (50mm depth) on top before finally pouring the concrete. I also put a 1 in 40 slope on it, so the rain didn’t form a pool on the patio.

Cheers

Dennis
Reply With Quote