Quote:
Originally Posted by Omaroo
I'm not a structural engineer, but I'm thinking that 1,800mm for the bottom section is going to be relatively flexible when you have an additional section sitting on top - and then the weight of the mount/scope as well. If you were to extend the gussets to run the full length and then cap it top & bottom & fill it with sand you might be OK. That's a heck of a length given that it looks like you're proposing 300mm tube (based on the 400mm base). How deep are you going to go with the foundations?
Cheers
Chris
|
Thanks Chris,
As Andrew pointed out I would probably need a 1m cubed foundation, and I like your idea about the gussets running the whole length, at least for the bottom section.
Cheers