View Single Post
  #17  
Old 08-10-2007, 12:25 PM
Stevo69
I have a To-Do List?

Stevo69 is offline
 
Join Date: Jun 2007
Location: Melbourne, Australia
Posts: 152
This weekend saw some progress on the Dobsonian project. I purchased 3/4-inch (19mm) B-B Grade 9-ply Hoop Pine in a 8'x4' sheet. This cost $130. I was going to buy the A-A grade marine ply but it was over $200 for the same size sheet. I visited three suppliers and decided to purchase from Construction Plywoods in Airport West.

I cut the secondary cage rings with great assistance from my Father. Then the rings were placed together and the centre holes drilled for the strut bolts. I recessed the holes for the struts with a 1 1/4-inch forstner bit down to a depth of 1/8-inch, and on the outside of the rings I recessed the washers so they are flush with the timber.

I routed a recess for the focuser board which will curved to match the inside tube. I will make that next week, hopefully when the Starlight Instruments Feather Touch focuser and the ProtoStar secondary mirror and spider arrives from the US.

I will attempt to bend a length of pine into a curve to match the curve of the rings.

I am using brass bolts and washers which I feel will complement the rich baltic stain I will give the timber. I have always liked brass fittings and fasteners on timber products. Now I'm off to buy some stain...
Attached Thumbnails
Click for full-size image (sec_cage_detail_1.jpg)
55.5 KB51 views
Click for full-size image (sec_cage_detail_2.jpg)
30.8 KB45 views
Click for full-size image (sec_cage_detail_3.jpg)
29.1 KB40 views
Click for full-size image (sec_cage_detail_4.jpg)
48.9 KB40 views
Click for full-size image (sec_cage_assembly.jpg)
98.8 KB65 views

Last edited by Stevo69; 10-10-2007 at 08:54 PM.
Reply With Quote