Talking Basic pier design

My observatory is soon to begin construction.... need to build the pier first, then an 1800x2400 roll off roof obs around it.
This is my design for the pier - I am going for a bolt down metal job for portability (relative portability I suppose!).
All steel will be 5mm thick, and will be galvanised after fabrication.

Any comments? - I am making the ribs very long as the pier is long, as I want it a metre off the obs floor for comfort, and since the obs will be on short posts it needs to be higher still.

What size plug of concrete do people think I should attach this thing to.... I was going to go about 600x600 by however deep I could get (600-750 or so).... should that be enough??

Ordered the pipe today!