View Single Post
  #4  
Old 23-11-2006, 04:34 PM
g__day's Avatar
g__day (Matthew)
Tech Guru

g__day is offline
 
Join Date: Dec 2005
Location: Sydney
Posts: 2,902
Definitely add gussets - the bigger the better. My pier was about 1.3m tall 140 mm diameter 5mm steel on a 45cm square base - all mig welded and bolted to concreted into a 160 kg lump of cement. Surprisingly this had alot of vibration compared to the tripod that came with the CG5. Filling the pier with sand didn't help either so I welded four 10cm by 8mm 1.1 metre tall gussets - now I have zero vibration. It was chalk and cheese once the gussets were added.
Attached Thumbnails
Click for full-size image (C925_new_pier01.JPG)
124.9 KB27 views
Click for full-size image (C925_new_pier02.JPG)
124.4 KB12 views
Click for full-size image (C925_new_pier03.JPG)
106.9 KB5 views

Last edited by g__day; 24-11-2006 at 01:59 AM.
Reply With Quote