Yep, between all my other projects, the Vic Suburban Rail Loop will be COMPLETED before I finish this!
Anyway, a quick spurt of activity has resulted in the cage being leveled and secured via star pickets (small cut offs from old ones).
Tin cut, Vapor barrier insulation stuck with double sided tape (amazing stuff!)
Insulation stuck in, tin screwed on and pestering lamb removed
We have a few old cool room panels laying around (thank goodness for a massive yard for storage of free spare goods your amazing partner scrounged). I'll cut one to size for a roof, then it's pretty much done for now. Felt the temp difference inside as I was working yesterday, significantly cooler already, without a roof.
Might line the inside with some sort of thin material, a I fear the wool fibres from the insulation might cause havoc