I did two additional tests using "Train PEC" In both cases the resulting Bisque PEC was placed "inverted" in the TCS PEC window.
The two images below show this. Fortunately the phase seems correct so it ought to be a fairly simple fix to make this work for all users in the S.H.
Run 1 1 sec exposures 4 periods
Run 2 .5 sec exposures 4 periods
The green line is the Bisque curve.
The Red line is a working PEMPro result.
The PEMPro result does look smoother. This may or may not be due to these measurements being taken on different nights. The PEMpro was in excellent seeing. Last night was just average.
Cheers,
Peter
|