View Single Post
  #91  
Old 18-08-2024, 04:34 PM
anthony2302749's Avatar
anthony2302749
Registered User

anthony2302749 is online now
 
Join Date: Aug 2005
Location: Melbourne
Posts: 542
Roof and Floor screwed and nailed

Afternoon All

So, this week saw the installation of the roof/dome support and the floor is now cut in and nailed down. One of the things that I did to make cable management a bit easier was to install a sub floor for the routing of any power or device which may be connected to the telescope. All made with repurposed timber from the old roll of box observatory.

Also, fiberglass the shutter for add water protection and slapped a bit of paint on the inside before installation for the last time.

Cheers
Attached Thumbnails
Click for full-size image (20240815_165502.jpg)
183.9 KB326 views
Click for full-size image (20240818_161651.jpg)
137.2 KB266 views
Click for full-size image (20240816_140901.jpg)
138.2 KB253 views
Click for full-size image (20240818_161732.jpg)
117.2 KB308 views
Click for full-size image (20240818_161933.jpg)
176.2 KB342 views
Reply With Quote