Roof and Floor screwed and nailed
Afternoon All
So, this week saw the installation of the roof/dome support and the floor is now cut in and nailed down. One of the things that I did to make cable management a bit easier was to install a sub floor for the routing of any power or device which may be connected to the telescope. All made with repurposed timber from the old roll of box observatory.
Also, fiberglass the shutter for add water protection and slapped a bit of paint on the inside before installation for the last time.
Cheers
|