My original training was in irrigation design and then valve sales.
Valve operating normally when operated manually -
Still blowing fuse, new solenoid -
Valve blockage (though none exists) has no relation to blowing fuse - these solenoids are designed to be active duty cycle for loooong extended periods.
Problem is probably further up the control line - eg transformer 240VAC to 24VDC is short circuiting.