Well finally it is all more or less in place.
The new computer is set up and can manage all three rigs via Asiair plus .
I now have a new flash modem that helps out with net and WiFi and I have the monitoring camera up and working such I can check things from the van.
I have started adding wheels to the roll off roof at either end rather than trying to replace the old ones which is a big job and not necessary ..assuming the current plan works.
I can not make the dual drum winch system work and being able to manage the roof movement from the van just won't happen as plans A B and C won't work...anyways I will not bother until I have the new wheels installed and can assess the rolling resistance.
There are many small jobs still but the only issue is one guide camera that seems faulty...it plays up thru Sharpcap but maybe it will behave when working with Asiair plus...if not it will need to be replaced and as it is on the 80mm I can run unguided as that is what I have always done.
It is a pity it is so wet as I just don't feel like doing anything in the observatory and I certainly can't add the remaining two wheels...
It is so good to be able to look at the RASA on my tablet while laying in bed...I think that is all I will do today.
.
Alex
|