Thread: Artemis 1
View Single Post
  #43  
Old 31-08-2022, 12:22 AM
glend (Glen)
Registered User

glend is offline
 
Join Date: Jun 2013
Location: Lake Macquarie
Posts: 7,121
Let's wait and see, concerning Friday. If they cannot resolve the bleed line problem on the number 3 engine, via cycling or software, they will need to roll the ship back to the Fab building in order to tear into the plumbing. Keep in mind these sort of tanks can only be pressurised and depressed about 6 times before they have to be scrapped, and they have used up 3 cycles already (This info from NASA Spaceflight.com).
If they roll back the next available launch window blows out.
Reply With Quote