View Single Post
  #1  
Old 18-07-2022, 08:56 AM
flick (Stefan)
Registered User

flick is offline
 
Join Date: Aug 2021
Location: Brisbane
Posts: 4
council approval

Hi everyone,

I am about to embark on building my own ROR obs and I'm currently in the planning stage. I'm planning an obs room with 1 pier and a warm room with 1 desk and shelving for storage of astronomy gear.

The dream, before looking into council approval, was a 3mx6m concrete slab with the entire roof rolling back over a water tank behind the slab. Half obs, half warm room/storage.

Since looking into it I have discovered that I can only get away with 10m2 structure without council approval. So my questions are:

1/ Does the land directly underneath the posts that will support the roof in the rolled off position count as the structure? I'm hoping if I place a watertank there then they won't count that part as structure if I am unlucky enough to get audited.

2/What does everybody register their structure as? I am awaiting a call back from a private certifier, I was planning on calling it a shed.

3/ For those that got their obs certified, did you need to get plans drawn up?

4/ Does anybody have any links to helpful resources for the build? I have run through most of the threads on this forum (some amazing structures there!) and I also have John Hicks "Building a roll-off roof observatory" book on the way to help.

Thanks for the help! I'll be sure to post some progress pictures once a shovel hits the dirt.
Reply With Quote